Short answer: Yes, in many cases. The City of Toronto requires a building permit for a deck that is more than 60 cm (24 in) above the adjacent finished ground. A lower, uncovered deck can be exempt if it is not part of a required exit and complies with the Zoning By-law. Decks attached to the house go through the permit process too, so confirm with Toronto Building before you build.
The 60 cm (24 inch) rule
Toronto Building lists decks among the projects that need a permit when the finished deck level is more than 60 cm (24 in) above the adjacent finished grade. The measurement is taken from the ground next to the deck to the top of the deck surface.
A deck at or below that height can be exempt from a permit, but only when all of the following are true:
- it is an uncovered platform (no roof);
- its finished deck level is not more than 60 cm above the adjacent finished grade;
- it does not form part of an exit required by the Building Code;
- it complies with the Zoning By-law (setbacks, height and coverage).
Attached decks and covered decks
Toronto's Express permit stream lists "a deck which is attached to an existing house" separately from detached decks above 60 cm — so plan on a permit for an attached deck and confirm with the city. Enclosing an existing deck, porch or patio of any size also needs a permit, and so does adding a roof.
Zoning still applies — even without a permit
A permit exemption does not exempt you from zoning. Under Zoning By-law 569-2013, an attached deck (or one within 0.3 m of a building) must respect the minimum building setbacks for your zone, and decks at or below the first storey are generally limited to 1.2 m above the ground below the platform, with exceptions depending on the wall they are attached to.
What a deck permit application usually shows
- a site plan with the deck's position and distances to lot lines;
- footing details (size and depth below frost);
- framing: columns, beams, joist size and spacing;
- stairs and guards (railings), with heights and openings.
Toronto charges a flat fee for a new deck regardless of its size. Fees change yearly — check the current schedule on toronto.ca.
Outside Toronto
Vaughan, Markham, Richmond Hill, Mississauga, Newmarket, Aurora and Bradford West Gwillimbury each run their own building departments and their own forms. The Ontario Building Code is the same, but thresholds and submission requirements differ. We check the rules for your address as part of every deck estimate.
This guide is general information, not legal advice. Building rules change — always confirm with your municipality's building department before you start.
Sources
Planning one? See our decks & railings page, or ask us below.